Big argument with bus driver
- Length: 1:39
- Rating Average: n/a
- View Count: 6
- Author: goldhawkroad
Tags: bus driver E8 impatient jump lights Metroline road works
Driver went through a red light on to oncoming traffic and refused to reverse. He sat there for five minutes. Roadworkers had to stop work to sort out the driver and direct traffic
skateboarding boardslide roadworks
- Length: 0:9
- Rating Average: n/a
- View Count: 47
- Author: aaronskatebeast
Tags: aaron barrier boardslide fence gate reynolds roadworks skate skateboarding
skateboarding boardslide roadworks gate fence barrier thing!
Pick up Demo and new road edger in RoR
- Length: 4:45
- Rating Average: n/a
- View Count: 37
- Author: rozfarmin
Tags: Farm industrial of Rigs Road Rods works
Pick up Demo and new road edger in RoR
Asphalt patches on Lajeunesse part 5
- Length: 0:52
- Rating Average: 5.00 from 1 people
- View Count: 28' favoriteCount='1
- Author: swisstankman
Tags: asphalt Balaye-Pro construction goudron Montreal patch road Soter tar works
The tar to keep the new asphalt in place///Le goudron "colasse" pour que la nouvelle asphalt ne se deplace pas
Westgate - Roadworks
- Length: 0:59
- Rating Average: n/a
- View Count: 16
- Author: AlertDrivingSchool
Tags: Driving Test Tip Westgate
Westgate - Road Roads. If it says 30km (Road Works) - SLOW DOWN TO 30km Even if the road is good. be slow. if you are over 35 you will fail the test. More Information @ http://www.AlertDrivingSchool.co.nz
Nurburgring on Fazer FZS1000 with VEEcam
- Length: 10:26
- Rating Average: 5.00 from 2 people
- View Count: 71
- Author: RealMrPotty
Tags: Bike Fazer Nordschleife Nurburgring Veecam
A lap of the Nurburgring Nordschleife tourist track on a Yamaha Fazer 1000. A reasonably clear lap, apart from two post-accident wrecks and roadworks. Video taken on VEEcam.
Asphalt patches on Papineau part 5
- Length: 1:10
- Rating Average: n/a
- View Count: 46
- Author: swisstankman
Tags: asphalt balais Balaye-Pro cold milling Montreal pavage paving pepine planage road rouleau Soter street sweeper works
Here we go, the finishing touch///Et voila, la finition
Asphalt patches on Papineau part 4
- Length: 0:54
- Rating Average: n/a
- View Count: 26
- Author: swisstankman
Tags: asphalt backhoe balais Balaye-Pro construction Montreal pavage planage road Soter street sweeper works
Ok, we're getting to the end now, getting this road fixed is hard work you know.///Ok, on acheve, les reparations au chaussee prennent du temps...
asphalt patches on papineau
- Length: 0:42
- Rating Average: n/a
- View Count: 75
- Author: swisstankman
Tags: asphalt backhoe balais Balaye-Pro cold construction johnston milling pavage planage road roller Soter street sweeper works
This is how we fix the roads in Montreal: my colleagues and I patching the roads one spot at a time//// Voici comment on repare les routes a Montreal: mes collegues et moi font des patchs une a la fois.
Crossing The Swinging Bridge
- Length: 0:48
- Rating Average: n/a
- View Count: 20
- Author: daz71
Tags: "Swinging Bridges" Camden Missouri
Driving from the Quad Cities in Illinois to Camdenton in Missouri in a rented car. I used GPS just in case there was trouble with road works. After about five hours of driving, just 15 miles from our destination the GPS took us down a dusty, country road and across this wonderful bridge.
Page: 1 of 47